arrow
返回
A

Arul Sundaramoorthy

University of Wisconsin System

20H指数
47论文数
1.4K被引数
收录论文 19
发表时间
Solution methods for vehicle-based inventory routing problems
err2017-06-01
err21
errOAAI
errDong, Yachao; Maravelias, Christos T.; Pinto, Jose M.; Sundaramoorthy, Arul
err分享
err收藏
Multiscale production routing in multicommodity supply chains with complex production facilities
err2017-03-01
err50
PREAI
errZhang, Qi; Sundaramoorthy, Arul; Grossmann, Ignacio E.; Pinto, Jose M.
err分享
err收藏
Risk-based integrated production scheduling and electricity procurement for continuous power-intensive processes
err2016-03-01
err52
errOAAI
errZhang, Qi; Cremer, Jochen L.; Grossmann, Ignacio E.; Sundaramoorthy, Arul; Pinto, Jose M.
err分享
err收藏
An adjustable robust optimization approach to scheduling of continuous industrial processes providing interruptible load
err2016-03-01
err103
errOAAI
errZhang, Qi; Morari, Michael F.; Grossmann, Ignacio E.; Sundaramoorthy, Arul; Pinto, Jose M.
err分享
err收藏
err分享
err收藏
MIP Model for Inventory Routing in Industrial Gases Supply Chain
err2014-06-11
err19
PREAI
errDong, Yachao; Pinto, Jose M.; Sundaramoorthy, Arul; Maravelias, Christos T.
err分享
err收藏
Worst-case design of subsea production facilities using semi-infinite programming
err2014-04-03
err7
PREAI
errStuber, Matthew D.; Wechsung, Achim; Sundaramoorthy, Arul; Barton, Paul I.
err分享
err收藏
Valid Inequalities Based on Demand Propagation for Chemical Production Scheduling MIP Models
err2013-02-05
err44
PREAI
errVelez, Sara; Sundaramoorthy, Arul; Maravelias, Christos T.
err分享
err收藏
A General Framework for Process Scheduling
err2011-02-08
err54
errOAAI
errSundaramoorthy, Arul; Maravelias, Christos T.
err分享
err收藏
Scheduling of Multistage Batch Processes under Utility Constraints
err2009-03-24
err39
PREAI
errSundaramoorthy, Arul; Maravelias, Christos T.; Prasad, Pradeep
err分享
err收藏
err分享
err收藏
err分享
err收藏