科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
H
Harun Turkoglu
Istanbul Technical University
9
H指数
34
论文数
289
被引数
0
相关解读
订阅
收录论文
11
发表时间
发表时间
IF
被引数
Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects
基于金雕优化器的多目标优化模型用于施工项目调度
Construction Management and Economics
IF
3.3
2025-05-28
0
PRE
AI
Harun Turkoglu; David Arditi; Gul Polat
分享
收藏
A Spatial Decision-Support System for Wind Farm Site Selection in Djibouti
SUSTAINABILITY
IF
3.3
2024-11-05
1
OA
AI
Abdi, Ayan Pierre; Damci, Atilla; Kirca, Ozgur; Turkoglu, Harun; Arditi, David; Demirkesen, Sevilay; Korkmaz, Mustafa; Arslan, Adil Enis
分享
收藏
An integrated multi-criteria decision making approach for selecting the starting location of railroad projects
construction engineering and management
IF
3.9
2024-08-27
1
PRE
AI
Turkoglu, Harun; Sadikoglu, Emel; Demirkesen, Sevilay; Damci, Atilla; Acar, Serra
分享
收藏
Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-05-01
2
PRE
AI
Turkoglu, Harun; Arditi, David; Polat, Gul
分享
收藏
Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-07-01
3
PRE
AI
Turkoglu, Harun; Arditi, David; Polat, Gul
分享
收藏
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
international entrepreneurship and management journal
IF
3.4
2022-11-08
7
PRE
AI
Selcuk, Onur; Turkoglu, Harun; Polat, Gul; Hajdu, Miklos
分享
收藏
Formwork System Selection Criteria for Building Construction Projects: A Structural Equation Modelling Approach
BUILDINGS
IF
3.1
2022-02-11
14
OA
AI
Terzioglu, Taylan; Polat, Gul; Turkoglu, Harun
分享
收藏
Analysis of Formwork System Selection Criteria for Building Construction Projects: A Comparative Study
BUILDINGS
IF
3.1
2021-12-06
15
OA
AI
Terzioglu, Taylan; Polat, Gul; Turkoglu, Harun
分享
收藏
A crashing-based time-cost trade-off model considering quality cost and contract clauses
international entrepreneurship and management journal
IF
3.4
2021-07-05
5
PRE
AI
Akin, Firat Dogu; Polat, Gul; Turkoglu, Harun; Damci, Atilla
分享
收藏
Crashing construction projects considering schedule flexibility: an illustrative example
international entrepreneurship and management journal
IF
3.4
2021-03-22
4
PRE
AI
Turkoglu, Harun; Polat, Gul; Akin, Firat Dogu
分享
收藏
Use of float consumption rate in resource leveling of construction projects
FRONTIERS OF ENGINEERING MANAGEMENT
IF
7.7
2020-06-04
6
PRE
AI
Damci, Atilla; Polat, Gul; Akin, Firat Dogu; Turkoglu, Harun
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
D
David Arditi
H 指数: 59 · 论文数: 277
G
Gül Polat
H 指数: 25 · 论文数: 105
S
Sevilay Demirkesen
H 指数: 19 · 论文数: 77
M
Miklós Hajdu
H 指数: 13 · 论文数: 61
A
Atilla Damcı
H 指数: 11 · 论文数: 46
查看更多