科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
K
Kuo‐Ching Ying
department of industrial engineering and management
42
H指数
146
论文数
5.5K
被引数
0
相关解读
订阅
收录论文
103
发表时间
发表时间
IF
被引数
Advanced scheduling for unrelated parallel additive manufacturing systems
非相关并行增材制造系统的先进调度
The International Journal of Advanced Manufacturing Technology
IF
0
2026-07-09
0
PRE
AI
Shih-Wei Lin; Kuo-Ching Ying
分享
收藏
Tracing the evolution of Particle Swarm Optimization in scheduling: A systematic review using main path analysis
追踪粒子群优化在调度中演化的系统综述:基于主要路径分析
Swarm and Evolutionary Computation
IF
8.5
2025-12-04
0
OA
AI
Kuo-Ching Ying; Pourya Pourhejazy; Kuan-Lun Huang
分享
收藏
An exploration of the shift work consideration in production scheduling
生产调度中轮班工作考量的探索
Journal of Computational Science
IF
3.7
2025-10-01
0
OA
AI
Kuo-Ching Ying; Pourya Pourhejazy; Shih-Cheng Lin
分享
收藏
From theory to practice: optimizing makespan in no-wait jobshops with no-passing constraints
从理论到实践:在无等待和无越序约束的作业车间中优化完工时间
Computers & Industrial Engineering
IF
6.5
2025-07-20
0
PRE
AI
Shih-Wei Lin; Kuo-Ching Ying
分享
收藏
The Interplay between Learning Effect and Order Acceptance in Production Planning
学习效应与订单接受在生产计划中的相互作用
Operations Research Perspectives
IF
3.7
2025-07-15
0
PRE
AI
Kuo-Ching Ying; Pourya Pourhejazy; Wei-Jie Zhou
分享
收藏
Scheduling with sequence-dependent setup times in short-term production planning: A main path analysis-based review
基于主要路径分析的生产计划短期规划中具有顺序相关准备时间的调度:一个基于主要路径分析的综述
Operations Research Perspectives
IF
3.7
2025-06-01
0
OA
AI
Kuo-Ching Ying; Pourya Pourhejazy; Zhi-Rong Lin
分享
收藏
An algorithmic review of the technological progress and milestones in resource-constrained project planning
资源约束项目规划中技术进步和里程碑的算法综述
ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT
IF
2.5
2024-12-29
0
PRE
AI
Pourhejazy, P.; Ying, K. -C.; Cheng, C. -Y
分享
收藏
Exploring the development trajectory of single-machine production scheduling
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-11-25
1
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Huang, Tz-chi
分享
收藏
Two-agent proportionate flowshop scheduling with deadlines: polynomial-time optimization algorithms
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-09-21
0
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Sung, Chuan-En
分享
收藏
Minimising makespan in distributed assembly hybrid flowshop scheduling problems
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2024-08-02
0
PRE
AI
Ying, Kuo-Ching; Lin, Shih-Wei; Chen, Kuan-Fu
分享
收藏
Revisiting the development trajectory of parallel machine scheduling
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2024-08-01
3
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Huang, Xin-Yi
分享
收藏
Tailored Iterated Greedy metaheuristic for a scheduling problem in metal 3D printing
ADVANCES IN ENGINEERING SOFTWARE
IF
5.7
2023-12-01
4
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Huang, Ya-Hsuan
分享
收藏
N-list-enhanced heuristic for distributed three-stage assembly permutation flow shop scheduling (Jul, 10.1007/s10479-023-05456-6, 2023)
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-07-24
0
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Fu, Po-Jui
分享
收藏
N-list-enhanced heuristic for distributed three-stage assembly permutation flow shop scheduling
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-07-04
5
OA
AI
Ying, Kuo-Ching; Pourhejazy, Pourya; Fu, Po-Jui
分享
收藏
Minimizing makespan in two-stage assembly additive manufacturing: A reinforcement learning iterated greedy algorithm
最小化两阶段装配增材制造中的制造时间: 一种强化学习迭代贪婪算法
APPLIED SOFT COMPUTING
IF
6.6
2023-05-01
12
PRE
AI
Ying, Kuo-Ching; Lin, Shih-Wei
分享
收藏
Minimizing total completion time in the no-wait jobshop scheduling problem using a backtracking metaheuristic
使用回溯元启发式最小化无等待作业车间调度问题中的总完成时间
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-07-01
11
PRE
AI
Ying, Kuo-Ching; Lin, Shih-Wei
分享
收藏
Adjusted Iterated Greedy for the optimization of additive manufacturing scheduling problems
用于优化增材制造调度问题的调整迭代贪婪
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2022-07-01
14
OA
AI
Ying, Kuo-Ching; Fruggiero, Fabio; Pourhejazy, Pourya; Lee, Bo-Yun
分享
收藏
Single machine scheduling problems with sequence-dependent setup times and precedence delays
具有顺序相关的设置时间和优先延迟的单机调度问题
SCIENTIFIC REPORTS
IF
3.9
2022-06-08
0
OA
AI
Lin, Shih-Wei; Ying, Kuo-Ching
分享
收藏
Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups
基于元拉马克的迭代贪婪,用于优化混合设置的分布式两级装配流程
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2022-02-03
16
PRE
AI
Pourhejazy, Pourya; Cheng, Chen-Yang; Ying, Kuo-Ching; Nam, Nguyen Hoai
分享
收藏
New benchmark algorithms for No-wait Flowshop Group Scheduling Problem with Sequence-Dependent Setup Times
具有序列相关设置时间的无等待Flowshop组调度问题的新基准算法
APPLIED SOFT COMPUTING
IF
6.6
2021-11-01
14
PRE
AI
Cheng, Chen-Yang; Pourhejazy, Pourya; Ying, Kuo-Ching; Liao, Yi-Hsiu
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
J
Jatinder N.D. Gupta
H 指数: 60 · 论文数: 351
S
Shih-Wei Lin
H 指数: 51 · 论文数: 276
刘
刘迎春
(Yingchun Liu)
H 指数: 51 · 论文数: 488
S
Shufen Li
H 指数: 43 · 论文数: 312
C
Ching‐Jong Liao
H 指数: 33 · 论文数: 103
查看更多