科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
D
Davide Castellano
Universita di Modena e Reggio Emilia
16
H指数
60
论文数
714
被引数
0
相关解读
订阅
收录论文
23
发表时间
发表时间
IF
被引数
Joint optimisation of bin location, allocation, type selection, and collection frequency under stochastic waste generation
在随机垃圾产生条件下的联合优化:储物箱位置、分配、类型选择及收集频率
Computers & Industrial Engineering
IF
6.5
2026-05-23
0
OA
AI
Bertolini, Massimo; Castellano, Davide; Mezzogori, Davide
分享
收藏
Quality cost deployment (QCD): a Lean-Inspired methodology for systematic reduction of total quality costs
质量成本部署(QCD):一种受精益思想启发的、用于系统性降低总质量成本的方
International Journal of Lean Six Sigma
IF
3.7
2026-03-16
0
PRE
AI
Massimo Bertolini; Davide Castellano
分享
收藏
On the Optimality of State-Dependent Base-Stock Policies for an Inventory System with PH-Type Disruptions
关于状态依赖型基-stock 策略在具有 PH-Type 中断的库存系统中的最优性
Logistics 2025, Vol. 9, Page 165
IF
3.6
2025-11-22
0
OA
AI
Davide Castellano
分享
收藏
Economic production quantity for a decaying item with stochastic demand and positive lead time
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2024-01-01
1
OA
AI
Castellano, Davide; Glock, Christoph H.
分享
收藏
A single-vendor, multiple-buyer coordinated supply chain model with unequal-sized batch shipments and cycle-dependent safety stocks
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2023-08-04
1
OA
AI
Castellano, Davide; Gallo, Mose; Glock, Christoph H.
分享
收藏
Optimizing production-inventory replenishment and lead time decisions under a fill rate constraint in a two-echelon sustainable supply chain with quality issues
international journal of systems science
IF
3.3
2023-02-19
9
OA
AI
Castellano, Davide; Gabbrielli, Roberto; Gallo, Mose; Giri, Bibhas C. C.; Sarkar, Sumon
分享
收藏
The average-cost formulation of lot sizing models and inventory carrying charges: a technical note
operations management
IF
5.3
2021-04-14
2
OA
AI
Castellano, Davide; Glock, Christoph H.
分享
收藏
Metaheuristics for the flow shop scheduling problem with maintenance activities integrated
集成了维护活动的流水车间调度问题的元启发式方法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2021-01-01
27
PRE
AI
Branda, Antonella; Castellano, Davide; Guizzi, Guido; Popolo, Valentina
分享
收藏
Safety stock management in single vendor-single buyer problem under VMI with consignment stock agreement (vol 154, pg 16, 2014)
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2020-11-01
0
PRE
AI
Braglia, Marcello; Castellano, Davide; Frosolini, Marco
分享
收藏
Revised overall labour effectiveness
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT
IF
3.5
2020-07-23
11
PRE
AI
Braglia, Marcello; Castellano, Davide; Frosolini, Marco; Gallo, Mose; Marrazzini, Leonardo
分享
收藏
Energy Cost Deployment (ECD): A novel lean approach to tackling energy losses
JOURNAL OF CLEANER PRODUCTION
IF
10
2020-02-01
18
PRE
AI
Braglia, Marcello; Castellano, Davide; Gabbrielli, Roberto; Marrazzini, Leonardo
分享
收藏
The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2019-12-01
17
PRE
AI
Castellano, Davide; Gallo, Mose; Grassi, Andrea; Santillo, Liberatina C.
分享
收藏
A continuous review, (Q, r) inventory model for a deteriorating item with random demand and positive lead time
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2019-09-01
25
PRE
AI
Braglia, Marcello; Castellano, Davide; Marrazzini, Leonardo; Song, Dongping
分享
收藏
Batching decisions in multi-item production systems with learning effect
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-05-01
15
PRE
AI
Castellano, Davide; Gallo, Mose; Grassi, Andrea; Santillo, Liberatina C.
分享
收藏
A visual planning solution to streamline the processes of hybrid cross-dockings
PRODUCTION PLANNING & CONTROL
IF
5.4
2019-01-13
6
PRE
AI
Braglia, Marcello; Castellano, Davide; Gallo, Mose; Romagnoli, Giovanni
分享
收藏
Controlling lead times and minor ordering costs in the joint replenishment problem with stochastic demands under the class of cyclic policies
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2018-06-28
14
PRE
AI
Braglia, Marcello; Castellano, Davide; Santillo, Liberatina; Song, Dongping
分享
收藏
Overall material usage effectiveness (OME): a structured indicator to measure the effective material usage within manufacturing processes
PRODUCTION PLANNING & CONTROL
IF
5.4
2017-11-12
25
PRE
AI
Braglia, M.; Castellano, D.; Frosolini, M.; Gallo, M.
分享
收藏
Distribution-free approach for stochastic Joint-Replenishment Problem with backorders-lost sales mixtures, and controllable major ordering cost and lead times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2017-03-01
34
PRE
AI
Braglia, Marcello; Castellano, Davide; Song, Dongping
分享
收藏
Just-in-time parts feeding policies for paced assembly lines: possible solutions for highly constrained layouts
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2015-05-05
9
OA
AI
Zammori, Francesco; Braglia, Marcello; Castellano, Davide
分享
收藏
Harmony search algorithm for single-machine scheduling problem with planned maintenance
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2014-10-01
46
PRE
AI
Zammori, Francesco; Braglia, Marcello; Castellano, Davide
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
C
C. H. Glock
H 指数: 54 · 论文数: 398
B
Bibhas C. Giri
H 指数: 49 · 论文数: 321
D
Dong‐Ping Song
H 指数: 36 · 论文数: 200
M
Marcello Braglia
H 指数: 36 · 论文数: 196
A
Andrea Grassi
H 指数: 23 · 论文数: 156
查看更多