科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
P
Pierre Lòpez
CNRS and Université de Toulouse
16
H指数
194
论文数
919
被引数
0
相关解读
订阅
收录论文
16
发表时间
发表时间
IF
被引数
Logic-based Benders method for multi-skill resource-constrained project scheduling with allocation and skill flexibility
基于逻辑的Benders方法用于多技能资源约束项目调度,具有分配和技能灵活性
European Journal of Operational Research
IF
6
2026-05-08
0
OA
AI
Carla Juvin; Christian Artigues; Pierre Lopez; Rémi Brux
分享
收藏
Project management and scheduling 2021
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-05-03
0
PRE
AI
Artigues, Christian; Briand, Cyril; Lopez, Pierre
分享
收藏
Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-10-17
2
PRE
AI
Sanchidrian, Tamara Borreguero; Portoleau, Tom; Artigues, Christian; Sanchez, Alvaro Garcia; Mier, Miguel Ortega; Lopez, Pierre
分享
收藏
Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2023-04-01
6
OA
AI
Juvin, Carla; Houssin, Laurent; Lopez, Pierre
分享
收藏
Improved bounds for hybrid flow shop scheduling with multiprocessor tasks
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2013-12-01
16
OA
AI
Lahimer, Asma; Lopez, Pierre; Haouari, Mohamed
分享
收藏
The energy scheduling problem: Industrial case-study and constraint propagation techniques
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2013-05-01
74
OA
AI
Artigues, Christian; Lopez, Pierre; Hait, Alain
分享
收藏
A note on event-based MILP models for resource-constrained project scheduling problems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-04-01
13
PRE
AI
Artigues, Christian; Brucker, Peter; Knust, Sigrid; Kone, Oumar; Lopez, Pierre; Mongeau, Marcel
分享
收藏
Multi-site scheduling under production and transportation constraints
生产运输约束下的多站点调度
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2013-03-01
16
OA
AI
H'Mida, Fehmi; Lopez, Pierre
分享
收藏
Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-03-01
12
OA
AI
Ben Hmida, Abir; Haouari, Mohamed; Huguet, Marie-Jose; Lopez, Pierre
分享
收藏
Discrepancy search for the flexible job shop scheduling problem
柔性作业车间调度问题的差异搜索
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2010-12-01
68
OA
AI
Ben Hmida, Abir; Haouari, Mohamed; Huguet, Marie-Jose; Lopez, Pierre
分享
收藏
Parallel machine scheduling with precedence constraints and setup times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2010-12-01
47
OA
AI
Gacias, Bernat; Artigues, Christian; Lopez, Pierre
分享
收藏
DECISION APPROACH TO WORKLOAD DISTRIBUTION
PRODUCTION PLANNING & CONTROL
IF
5.4
2007-11-14
2
PRE
AI
THURIOT, C; ERSCHLER, J; LOPEZ, P
分享
收藏
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2005-09-01
53
PRE
AI
Artigues, C; Lopez, P; Ayache, PD
分享
收藏
On Not-First/Not-Last conditions in disjunctive scheduling
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2000-12-01
24
OA
AI
Torres, P; Lopez, P
分享
收藏
Characterisation by decomposition in scheduling
COMPUTERS IN INDUSTRY
IF
9.1
1998-04-01
0
PRE
AI
Lopez, P; Levy, ML; Pradin, B
分享
收藏
Cooperative system design in scheduling
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
1998-01-01
6
PRE
AI
Lopez, P; Esquirol, P; Haudot, L; Sicard, M
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
P
Peter Brucker
H 指数: 46 · 论文数: 225
M
Mohamed Haouari
H 指数: 39 · 论文数: 227
S
Sigrid Knust
H 指数: 29 · 论文数: 116
C
Christian Artigues
H 指数: 23 · 论文数: 199
M
Marcel Mongeau
H 指数: 20 · 论文数: 124
查看更多