科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
M
Mohammad Ranjbar
Sharif University of Technology
20
H指数
77
论文数
1.0K
被引数
0
相关解读
订阅
收录论文
30
发表时间
发表时间
IF
被引数
Dynamic soft-kill weapon-target assignment in naval environments
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-11-01
0
PRE
AI
Tashakori, Sadegh; Ranjbar, Mohammad; Balochian, Saeed; Sharif-Razavian, Javad; Peymankar, Mahboobeh
分享
收藏
Energy-aware flow shop scheduling with uncertain renewable energy
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2024-10-01
1
PRE
AI
Ghorbanzadeh, Masoumeh; Davari, Morteza; Ranjbar, Mohammad
分享
收藏
The assignment of project managers to projects in an uncertain dynamic environment
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-08-02
0
PRE
AI
Rezaeian, Aidin; Koosha, Hamidreza; Ranjbar, Mohammad; Poormoaied, Saeed
分享
收藏
Optimal resource allocation and routing in robotic mobile fulfillment systems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2024-05-01
6
PRE
AI
Hashemi, Saeedeh; Ranjbar, Mohammad
分享
收藏
A logic-based Benders decomposition algorithm for a repair crew routing and drone scheduling problem after a natural disaster
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2023-09-01
3
OA
AI
Shadlou, Motahhareh Safdari; Ranjbar, Mohammad; Salari, Majid
分享
收藏
A two-step scheduling and rescheduling framework for integrated production and usage-based maintenance planning under TOU electricity tariffs: A case study of the tile industry
JOURNAL OF CLEANER PRODUCTION
IF
10
2023-09-01
2
PRE
AI
Forghani, Asefe; Lotfi, M. M.; Ranjbar, Mohammad; Sadegheih, Ahmad
分享
收藏
Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2023-06-01
17
PRE
AI
Ghorbanzadeh, Masoumeh; Ranjbar, Mohammad
分享
收藏
Product safety assessment in a dairy dual-channel supply chain using game theory
基于博弈论的乳制品双渠道供应链产品安全评价
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-04-08
4
PRE
AI
Zamiri-Noghreh, Emad; Safarzadeh, Soroush; Ranjbar, Mohammad
分享
收藏
Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-02-01
23
PRE
AI
Saber, Reza Ghorbani; Ranjbar, Mohammad
分享
收藏
Hierarchical framework for maintenance and production scheduling of continuous ball mills in tile industries under TOU electricity pricing
JOURNAL OF CLEANER PRODUCTION
IF
10
2021-12-01
5
PRE
AI
Forghani, Asefe; Lotfi, M. M.; Ranjbar, Mohammad; Sadegheih, Ahmad
分享
收藏
Maximizing the expected net present value in a project with uncertain cash flows
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2021-10-01
12
PRE
AI
Peymankar, Mahboobeh; Davari, Morteza; Ranjbar, Mohammad
分享
收藏
A variable neighborhood search algorithm for transshipment scheduling of multi products at a single station
APPLIED SOFT COMPUTING
IF
6.6
2021-01-01
6
PRE
AI
Ranjbar, Mohammad; Saber, Reza Ghorbani
分享
收藏
Minimizing makespan on a single machine with release dates and inventory constraints
在具有发布日期和库存限制的单台机器上最小化完工时间
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2020-10-01
9
OA
AI
Davari, Morteza; Ranjbar, Mohammad; De Causmaecker, Patrick; Leus, Roel
分享
收藏
A two-stage stochastic programming approach for a multi-objective course timetabling problem with courses cancelation risk
具有课程取消风险的多目标课程时间表问题的两阶段随机规划方法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-04-01
20
PRE
AI
Yasari, Peyman; Ranjbar, Mohammad; Jamili, Negin; Shaelaie, Mohammad-Hesam
分享
收藏
A generalized variable neighborhood search algorithm for the talent scheduling problem
人才调度问题的广义变邻域搜索算法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2018-12-01
6
PRE
AI
Ranjbar, Mohammad; Kazemi, Ahmad
分享
收藏
Integration of parts transportation without cross docking in a supply chain
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2018-04-01
6
PRE
AI
Shaelaie, Mohammad-Hesam; Ranjbar, Mohammad; Jamili, Negin
分享
收藏
Scheduling of loading and unloading operations in a multi stations transshipment terminal with release date and inventory constraints
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-04-01
16
PRE
AI
Bazgosha, Atiyeh; Ranjbar, Mohammad; Jamili, Negin
分享
收藏
Generation expansion planning by considering energy-efficiency programs in a competitive environment
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS
IF
5
2016-09-01
27
PRE
AI
Motie, Saeid; Keynia, Farshid; Ranjbar, Mohammad Reza; Maleki, Akbar
分享
收藏
A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2016-07-01
37
PRE
AI
Jamili, Negin; Ranjbar, Mohammad; Salari, Majid
分享
收藏
Sources' Response for supplying energy of a residential load in the form of on-grid hybrid systems
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS
IF
5
2015-01-01
26
PRE
AI
Ranjbar, Mohammad Reza; Kouhi, Sajjad
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
A
Akbar Maleki
H 指数: 52 · 论文数: 129
S
S.M.T. Fatemi Ghomi
H 指数: 47 · 论文数: 312
F
Farshid Keynia
H 指数: 38 · 论文数: 120
P
Patrick De Causmaecker
H 指数: 37 · 论文数: 284
R
Roel Leus
H 指数: 31 · 论文数: 257
查看更多