Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room schedulingCOMPUTERS & INDUSTRIAL ENGINEERINGIF6.52022-06-018OAAI
System survivability in the context of interdiction networksRELIABILITY ENGINEERING & SYSTEM SAFETYIF112019-05-0114PREAI
Systems under attack-survivability rather than reliability: Concept, results, and applicationsEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62017-05-0114PREAI
A multi-attribute utility model for generating a sustainability index in the banking sectorJOURNAL OF CLEANER PRODUCTIONIF102016-02-0153PREAI
Optimal resource allocation for security in reliability systemsEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62007-09-01157PREAI
A chance-constrained multi-period model for a special multi-reservoir systemCOMPUTERS & OPERATIONS RESEARCHIF4.32005-05-0158PREAI
A 0-1 goal programming model for nurse schedulingCOMPUTERS & OPERATIONS RESEARCHIF4.32005-03-01175PREAI
A model for conjunctive use of ground and surface water with opportunity costsEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62002-12-0146PREAI
A single-period model for conjunctive use of ground and surface water under severe overdrafts and water deficitEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62001-09-0132PREAI
Optimal cropping patterns under water deficitsEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62001-04-0150PREAI