科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
Jongsung Won
korea national university of transportation
14
H指数
54
论文数
1.5K
被引数
0
相关解读
订阅
收录论文
13
发表时间
发表时间
IF
被引数
Fine-Tuned Prompt Literacy for GenAI-Mediated L2 Writing: An Interaction-First Learning-and-Accountability Framework
微调提示素养以用于GenAI介导的L2写作:一种以互动为先的学习与问责框架
Applied Sciences-Basel
IF
2.5
2026-04-24
1
PRE
AI
Kang, Joohoon; Won, Jongsung
分享
收藏
Constructability Analyses of Vertical Extension Methods for Existing Underground Spaces
SUSTAINABILITY
IF
3.3
2021-03-25
2
OA
AI
Seo, Soo-Yeon; Lee, Byunghee; Won, Jongsung
分享
收藏
ANALYSIS OF CONSTRUCTION PRODUCTIVITY BASED ON CONSTRUCTION DURATION PER FLOOR AND PER GROSS AREA, WITH IDENTIFICATION OF INFLUENTIAL FACTORS
management in engineering
IF
3.7
2021-03-22
3
OA
AI
Lee, Chijoo; Won, Jongsung
分享
收藏
Comparative Analysis of Economic Impacts of Sustainable Vertical Extension Methods for Existing Underground Spaces
SUSTAINABILITY
IF
3.3
2020-01-29
8
OA
AI
Seo, Soo-yeon; Lee, Byunghee; Won, Jongsung
分享
收藏
An integrated underground utility management and decision support based on BIM and GIS
AUTOMATION IN CONSTRUCTION
IF
11.5
2019-11-01
73
PRE
AI
Wang, Mingzhu; Deng, Yichuan; Won, Jongsung; Cheng, Jack C. P.
分享
收藏
Method for Predicting Raw Material Prices for Product Production over Long Periods
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2019-01-01
16
PRE
AI
Lee, Chijoo; Won, Jongsung; Lee, Eul-Bum
分享
收藏
Analysis of combinations of glazing properties to improve economic efficiency of buildings
JOURNAL OF CLEANER PRODUCTION
IF
10
2017-11-01
16
PRE
AI
Lee, Chijoo; Won, Jongsung
分享
收藏
Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization
识别建筑信息建模的潜在机会,用于建筑和拆除废物管理和最小化
AUTOMATION IN CONSTRUCTION
IF
11.5
2017-07-01
129
PRE
AI
Won, Jongsung; Cheng, Jack C. P.
分享
收藏
How to tell if a BIM project is successful: A goal-driven approach
如何判断BIM项目是否成功: 目标驱动的方法
AUTOMATION IN CONSTRUCTION
IF
11.5
2016-09-01
59
PRE
AI
Won, Jongsung; Lee, Ghang
分享
收藏
Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea
WASTE MANAGEMENT
IF
7.1
2016-03-01
127
PRE
AI
Won, Jongsung; Cheng, Jack C. P.; Lee, Ghang
分享
收藏
A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM)
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
IF
7.5
2016-01-01
118
PRE
AI
Lu, Qiqi; Won, Jongsung; Cheng, Jack C. P.
分享
收藏
Where to Focus for Successful Adoption of Building Information Modeling within Organization
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2013-11-01
187
PRE
AI
Won, Jongsung; Lee, Ghang; Dossick, Carrie; Messner, John
分享
收藏
D3 City project - Economic impact of BIM-assisted design validation
AUTOMATION IN CONSTRUCTION
IF
11.5
2012-03-01
99
PRE
AI
Lee, Ghang; Park, Harrison Kwangho; Won, Jongsung
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
J
Jack C.P. Cheng
H 指数: 71 · 论文数: 423
M
Mingzhu Wang
H 指数: 36 · 论文数: 168
J
John Messner
H 指数: 33 · 论文数: 296
G
Ghang Lee
H 指数: 32 · 论文数: 186
E
Eul‐Bum Lee
H 指数: 23 · 论文数: 110
查看更多