科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
A
Amir Abbas Najafi
K. N. Toosi University of Technology
21
H指数
87
论文数
1.4K
被引数
0
相关解读
订阅
收录论文
22
发表时间
发表时间
IF
被引数
A stochastic bi-objective project scheduling model under failure of activities
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2023-10-16
2
PRE
AI
Rezaei, Fatemeh; Najafi, Amir Abbas; Demeulemeester, Erik; Ramezanian, Reza
分享
收藏
Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2021-10-01
11
OA
AI
Rezaei, Fatemeh; Najafi, Amir Abbas; Ramezanian, Reza; Demeulemeester, Erik
分享
收藏
A bi-objective simulation-based optimization algorithm for redundancy allocation problem in series-parallel systems
基于双目标仿真的串并联系统冗余分配优化算法
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2021-07-01
37
PRE
AI
Chambari, Amirhossein; Azimi, Parham; Najafi, Amir Abbas
分享
收藏
Open-shop production scheduling with reverse flows
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2021-03-01
16
PRE
AI
Aghighi, Saba; Niaki, Seyed Taghi Akhavan; Mehdizadeh, Esmaeil; Najafi, Amir Abbas
分享
收藏
Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
INTERNATIONAL JOURNAL OF FUZZY SYSTEMS
IF
3.6
2021-02-05
17
PRE
AI
Ghamginzadeh, Arman; Najafi, Amir Abbas; Khalilzadeh, Mohammad
分享
收藏
Mean-conditional value at risk model for the stochastic project scheduling problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2020-04-01
31
PRE
AI
Rezaei, Fatemeh; Najafi, Amir Abbas; Ramezanian, Reza
分享
收藏
Condition based maintenance policy for series-parallel systems through Proportional Hazards Model: A multi-stage stochastic programming approach
通过比例风险模型对串并联系统进行基于状态的维护策略: 一种多阶段随机规划方法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2018-12-01
20
PRE
AI
Yahyatabar, Ali; Najafi, Amir Abbas
分享
收藏
Portfolio Selection Using Z-Number Theory: Two Solution Methodologies
INTERNATIONAL JOURNAL OF FUZZY SYSTEMS
IF
3.6
2018-07-18
12
PRE
AI
Jirofti, Amirsina; Najafi, Amir Abbas
分享
收藏
Support vector machine with Dirichlet feature mapping
基于Dirichlet特征映射的支持向量机
NEURAL NETWORKS
IF
6.3
2018-02-01
57
PRE
AI
Nedaie, Ali; Najafi, Amir Abbas
分享
收藏
A quadratic reproduction based Invasive Weed Optimization algorithm to minimize periodic preventive maintenance cost for series-parallel systems
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-08-01
13
PRE
AI
Yahyatabar, Ali; Najafi, Amir Abbas
分享
收藏
Polar support vector machine: Single and multiple outputs
NEUROCOMPUTING
IF
6.5
2016-01-01
11
PRE
AI
Nedaie, Ali; Najafi, Amir Abbas
分享
收藏
Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2015-09-01
27
PRE
AI
Shahsavar, Aria; Najafi, Amir Abbas; Niaki, Seyed Taghi Akhavan
分享
收藏
Multi-stage stochastic mean-semivariance-CVaR portfolio optimization under transaction costs
交易费用下的多阶段随机均值-半方差-CVaR投资组合优化
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2015-04-01
57
PRE
AI
Najafi, Amir Abbas; Mushakhian, Siamak
分享
收藏
A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2014-10-01
69
PRE
AI
Afruzi, Elham Nabipoor; Najafi, Amir Abbas; Roghanian, Emad; Mazinani, Mostafa
分享
收藏
An efficient simulated annealing algorithm for the redundancy allocation problem with a choice of redundancy strategies
一种有效的模拟退火算法,用于选择冗余策略的冗余分配问题
RELIABILITY ENGINEERING & SYSTEM SAFETY
IF
11
2013-11-01
70
PRE
AI
Chambari, Amirhossain; Najafi, Amir Abbas; Rahmati, Seyed Habib A.; Karimi, Aida
分享
收藏
Resource constrained project scheduling problem with discounted earliness-tardiness penalties: Mathematical modeling and solving procedure
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2013-10-01
30
PRE
AI
Khoshjahan, Yazdan; Najafi, Amir Abbas; Afshar-Nadjafi, Behrouz
分享
收藏
Robust goal programming for multi-objective portfolio selection problem
ECONOMIC MODELLING
IF
4.7
2013-07-01
36
PRE
AI
Ghahtarani, Alireza; Najafi, Amir Abbas
分享
收藏
A bi-objective model to optimize reliability and cost of system with a choice of redundancy strategies
通过选择冗余策略来优化系统可靠性和成本的双目标模型
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2012-08-01
103
PRE
AI
Chambari, Amirhossain; Rahmati, Seyed Habib A.; Najafi, Amir Abbas; Karimi, Aida
分享
收藏
Group scheduling in flexible flow shops: a hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism
柔性流水车间中的组调度: 帝国主义竞争算法和类电磁机制的混合方法
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2011-08-15
49
PRE
AI
Karimi, N.; Zandieh, M.; Najafi, A. A.
分享
收藏
An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem
ADVANCES IN ENGINEERING SOFTWARE
IF
5.7
2010-07-01
24
PRE
AI
Shahsavar, Moslem; Niaki, Seyed Taghi Akhavan; Najafi, Amir Abbas
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
E
Erik Demeulemeester
H 指数: 55 · 论文数: 352
M
M. Zandieh
H 指数: 55 · 论文数: 273
S
Seyed Taghi Akhavan Niaki
H 指数: 53 · 论文数: 398
M
Mohammad Khalilzadeh
H 指数: 26 · 论文数: 161
E
Emad Roghanian
H 指数: 19 · 论文数: 92
查看更多