arrow
返回

张彪 (Biao Zhang)

liaocheng university

11H指数
31论文数
377被引数
收录论文 24
发表时间
MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
err2025-01-01
err0
errOAAI
errYang, Shiming; Meng, Leilei; Ullah, Saif; Zhang, Biao; Sang, Hongyan; Duan, Peng
err分享
err收藏
err分享
err收藏

研究方向

[16]多目标进化算法1013-1038.调度算法多目标优化双向mamba增强的多模态融合情感框架第-2-页共3页