科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
Jarosław Pempera
wroclaw university of science & technology
14
H指数
66
论文数
1.0K
被引数
0
相关解读
订阅
收录论文
14
发表时间
发表时间
IF
被引数
Optimal Solving of a Scheduling Problem Using Quantum Annealing Metaheuristics on the D-Wave Quantum Solver
ieee transactions on cybernetics
IF
8.7
2025-01-01
0
PRE
AI
Bozejko, Wojciech; Klempous, Ryszard; Pempera, Jaroslaw; Rozenblit, Jerzy; Smutnicki, Czeslaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
分享
收藏
Quantum annealing-driven branch and bound for the single machine total weighted number of tardy jobs scheduling problem
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE
IF
6.1
2024-06-01
3
PRE
AI
Bozejko, Wojciech; Pempera, Jaroslaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
分享
收藏
Optimal solving of a binary knapsack problem on a D-Wave quantum machine and its implementation in production systems
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-05-13
2
OA
AI
Bozejko, Wojciech; Burduk, Anna; Pempera, Jaroslaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
分享
收藏
The no-wait cyclic scheduling of delivery traffic in the grid distribution network
网格配电网传输流量的无等待循环调度
ISA TRANSACTIONS
IF
6.5
2022-12-01
0
PRE
AI
Wojcik, Robert; Pempera, Jaroslaw; Bocewicz, Grzegorz; Banaszak, Zbigniew
分享
收藏
Cyclic flow-shop scheduling with no-wait constraints and missing operations
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-10-01
11
PRE
AI
Smutnicki, Czeslaw; Pempera, Jaroslaw; Bocewicz, Grzegorz; Banaszak, Zbigniew
分享
收藏
Neuro-tabu search approach to scheduling in automotive manufacturing
NEUROCOMPUTING
IF
6.5
2021-09-01
1
PRE
AI
Bozejko, Wojciech; Burduk, Anna; Musial, Kamil; Pempera, Jaroslaw
分享
收藏
Optimization of production process for resource utilization
ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING
IF
4.4
2019-08-01
1
PRE
AI
Bozejko, Wojciech; Burduk, Anna; Pempera, Jaroslaw; Wodecki, Mieczyslaw
分享
收藏
Open shop cyclic scheduling
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2018-09-01
19
PRE
AI
Pempera, Jaroslaw; Smutnicki, Czeslaw
分享
收藏
Parallel tabu search for the cyclic job shop scheduling problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-11-01
38
PRE
AI
Bozejko, Wojciech; Gnatowski, Andrzej; Pempera, Jaroslaw; Wodecki, Mieczyslaw
分享
收藏
A new approach for multi-criteria scheduling
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2015-12-01
11
PRE
AI
Smutnicki, Czeslaw; Pempera, Jaroslaw; Rudy, Jaroslaw; Zelazny, Dominik
分享
收藏
Parallel tabu search algorithm for the hybrid flow shop problem
混合流水车间问题的并行禁忌搜索算法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2013-07-01
41
PRE
AI
Bozejko, Wojciech; Pempera, Jaroslaw; Smutnicki, Czeslaw
分享
收藏
The permutation flow shop problem with blocking. A tabu search approach
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2007-06-01
134
PRE
AI
Grabowski, Jozef; Pempera, Jaroslaw
分享
收藏
Some local search algorithms for no-wait flow-shop problem with makespan criterion
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2005-08-01
154
PRE
AI
Grabowski, J; Pempera, J
分享
收藏
Sequencing of jobs in some production system
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2000-09-01
181
PRE
AI
Grabowski, J; Pempera, J
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
Z
Zbigniew Banaszak
H 指数: 25 · 论文数: 299
G
Grzegorz Bocewicz
H 指数: 24 · 论文数: 262
W
Wojciech Bożejko
H 指数: 19 · 论文数: 178
C
Czesław Smutnicki
H 指数: 18 · 论文数: 93
M
Mieczysław Wodecki
H 指数: 18 · 论文数: 133
查看更多