arrow
返回
M

Mieczysław Wodecki

wrocław university of science and technology

18H指数
133论文数
1.3K被引数
收录论文 17
发表时间
Optimal Solving of a Scheduling Problem Using Quantum Annealing Metaheuristics on the D-Wave Quantum Solver
err2025-01-01
err0
PREAI
errBozejko, Wojciech; Klempous, Ryszard; Pempera, Jaroslaw; Rozenblit, Jerzy; Smutnicki, Czeslaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
err分享
err收藏
Optimal solving of a binary knapsack problem on a D-Wave quantum machine and its implementation in production systems
err2024-05-13
err2
errOAAI
errBozejko, Wojciech; Burduk, Anna; Pempera, Jaroslaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
err分享
err收藏
Optimization of production process for resource utilization
err2019-08-01
err1
PREAI
errBozejko, Wojciech; Burduk, Anna; Pempera, Jaroslaw; Wodecki, Mieczyslaw
err分享
err收藏
Flowshop scheduling of construction processes with uncertain parameters
err2019-03-01
err16
PREAI
errBozejko, Wojciech; Hejducki, Zdzislaw; Wodecki, Mieczyslaw
err分享
err收藏
Parallel tabu search for the cyclic job shop scheduling problem
err2017-11-01
err38
PREAI
errBozejko, Wojciech; Gnatowski, Andrzej; Pempera, Jaroslaw; Wodecki, Mieczyslaw
err分享
err收藏
Parallel metaheuristics for the cyclic flow shop scheduling problem
err2016-05-01
err15
PREAI
errBozejko, Wojciech; Uchronski, Mariusz; Wodecki, Mieczyslaw
err分享
err收藏
Block approach to the cyclic flow shop scheduling
err2015-03-01
err19
PREAI
errBozejko, Wojciech; Uchronski, Mariusz; Wodecki, Mieczyslaw
err分享
err收藏
Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
err2014-07-04
err21
errOAAI
errBozejko, Wojciech; Hejducki, Zdzislaw; Uchronski, Mariusz; Wodecki, Mieczyslaw
err分享
err收藏
APPLYING METAHEURISTIC STRATEGIES IN CONSTRUCTION PROJECTS MANAGEMENT
err2012-09-28
err28
errOAAI
errBozejko, Wojciech; Hejducki, Zdzislaw; Wodecki, Mieczyslaw
err分享
err收藏
err分享
err收藏
err分享
err收藏