In this paper, we propose a novel construction project progress forecasting approach which combines the grey dynamic prediction model and the residual modified model to forecast the current progress during the construction phase. Firstly, four typical S-curves simplified from various sigmoid curves are proposed and fitted to the grey dynamic prediction model. For higher prediction accuracy, three different residual modified models are taken to amend the initial prediction value which was derived from the above step. The mean absolute percentage error (MAPE) and standard deviation of the estimate of Y(SDY) are used to assess the accuracy of the composite results. The better residual modified prediction model is adopted to combine the grey dynamic prediction model to form the novel progress forecasting approach. Then, practical completed construction cases are provided for testing the prediction ability of the proposed progress forecasting approach. Results show that the forecasting approach proposed to forecast construction progress during construction phase is able to get better prediction accuracy almost within 10% whether typical S-curves or practical cases. The new approach relatively provides an accurate, simple and stable method for predicting construction progress in comparison with the previous traditional forecasting methods. (C) 2011 Elsevier Ltd. All rights reserved.
Keyword:
Construction project
Forecast
Grey dynamic prediction model
Modified residual model
Polynomial
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
3.0W
被引数:
10.2W