返回
Delay Analysis under Multiple Baseline Updates
PRE
AI
DOI:10.1061/(asce)0733-9364(2008)134:8(575).png)
摘要
En
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
Multiple-window Modified But-For analysis of project delays and accelerations
2021-04-22
4
Bhih, Moneer; Hegazy, Tarek
PREAI
New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects
2022-11-01
8
Cevikba, Murat; Okudan, Ozan; Isik, Zeynep
PREAI
The Compound Multiple-Baseline Design复合多重基线设计
2025-01-08
0
Lloveras, Lindsay A.; Tate, Savannah A.; Vollmer, Timothy R.; Gravina, Nicole E.; Dallery, Jesse
PREAI
Status Update Control and Analysis Under Two-Way Delay
2023-12-01
5
OAAI
Moltafet, Mohammad; Codreanu, Marian; Leinonen, Markus; Yates, Roy D.
Robust stability analysis of generalized neural networks with multiple discrete delays and multiple distributed delays
NEUROCOMPUTING
2009-03-01
18
Liu, Xiaoyang; Jiang, Nan
IF6.5
PREAI
Baseline-dependency: How genotype and signaled delays influence amphetamine ' s effects on delay discounting基线依赖性: 基因型和信号延迟如何影响苯丙胺对延迟贴现的影响
2020-12-01
7
Pope, Derek A.; Hutsell, Blake; Newland, M. Christopher
PREAI
Multichannel scan surface plasmon resonance biochip with stationary optics and baseline updating capability具有固定光学器件和基线更新能力的多通道扫描表面等离子体共振生物芯片
2013-11-05
6
OAAI
Wang, Cheng; Liu, Ruping; Zhang, Wei; Wang, Yujian; Xu, Kai; Yue, Zhao; Liu, Guohua
A spectral element approach for the stability analysis of time-periodic delay equations with multiple delays具有多个时滞的时间周期时滞方程稳定性分析的谱元方法
2013-08-01
27
Khasawneh, Firas A.; Mann, Brian P.
PREAI
期刊
暂无期刊信息
机构
暂无机构信息
引用论文
暂无论文信息

