Modularization and assembly algorithm for efficient MEP construction
DOI:10.1016/j.autcon.2011.03.002.png)
摘要
En 中文
This paper presents an algorithm for efficiently designing, fabricating, and constructing the mechanical, electrical, and plumbing (MEP) systems for buildings. MEP facility construction presents numerous challenges related to its complexity, space limitations, and interference with other trades working in confined areas. Besides, schedule delays can easily be caused by the uncontrolled delivery schedule of the components. This research provides a rational planning algorithm which packages large and complex MEP systems into several smaller fabricated components using spatial planning algorithms to increase the efficiency of the installation process, create a safer work environment, improve construction quality and productivity, reduce construction cycle time, and minimize cost. Furthermore, the technique is verified and validated by three experts and a case study is presented to demonstrate the effectiveness of this algorithm. (C) 2011 Elsevier B.V. All rights reserved.
Keyword:
MEP system
Prefabrication
Schedule delay
Space conflict
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.2K
被引数:
4.2W
机构
引用论文
Two Synthetic Antibodies that Recognize and Neutralize Distinct Proteolytic Forms of the Ebola Virus Envelope Glycoprotein
ChemBioChem
IF0