arrow
返回

Process scheduling for prefabricated construction based on multi-objective optimization algorithm

delete2024-12-01
delete0
PRE
AI
Y
Yan Li
J
Jiajun Wu
Y
Yi Hao
Y
Yuchen Gao
R
Runqi Chai
柴
柴森春 (Senchun Chai) *
张
张百海 (Baihai Zhang)
DOI:10.1016/j.autcon.2024.105809delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
Prefabricated construction has become an increasingly important focus area in the development of the construction industry. Determining an optimal construction process scheduling program is an urgent challenge during the project execution stage. This paper presents a multi-objective optimization problem with the objective function of minimizing the total construction time and maximizing the coordinated scheduling coefficient, and proposes a non-dominated sorting genetic algorithm based on the subspecies differentiation strategy (SD-NSGA) to solve the problem. The algorithm extends the competition phenomenon at the individual level to the subpopulation level in the traditional genetic algorithm (GA). The results demonstrate that SDNSGA exhibits superior optimization capabilities. Compared with the initial scheme of a real residential construction project, the total working time is shortened by 35.49% and the integrated dispatch factor is increased by 365.79%. Therefore, the proposed algorithm can offer a valuable reference for determining scheduling plans in practical engineering projects.1 1
Keyword:
Prefabricated construction
Process scheduling
Multi-objective optimization
Non-dominated sorting genetic algorithm
Subspecies differentiation strategy

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.3K
被引数:
4.6W

机构

B
Beijing Institute of Technology
学者数:
5.5K
论文数: 1.6K
被引数: 0
引用论文

引用论文

Large-scale evolutionary optimization: A review and comparative study☆
err2024-03-01
err29
errOAAI
errLiu, Jing; Sarker, Ruhul; Elsayed, Saber; Essam, Daryl; Siswanto, Nurhadi
err分享
err收藏
Critical review of the research on the management of prefabricated construction
err2014-07-01
err342
PREAI
errLi, Zhengdao; Shen, Geoffrey Qiping; Xue, Xiaolong
err分享
err收藏
Multi-objective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem
err2019-10-01
err36
PREAI
errZabihi, Sina; Kahag, Mahdi Rashidi; Maghsoudlou, Hamidreza; Afshar-Nadjafi, Behrouz
err分享
err收藏
err分享
err收藏
学者 查看更多内容