arrow
返回

Procuring complex performance: the transition process in public infrastructure

delete2014-01-28
delete60
delete
OA
AI
A
Andreas Hartmann *
J
Jens K. Roehrich
L
Lars Frederiksen
A
Andrew Davies
DOI:10.1108/IJOPM-01-2011-0032delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Purpose - The paper analyses how public buyers transition from procuring single products and services to procuring complex performance (PCP). The aim is to examine the change in the interactions between buyer and supplier, the emergence of value co-creation and the capability development during the transition process. Design/methodology/approach - A multiple, longitudinal case study method is used to examine the transition-towards-PCP. The study deploys rich qualitative-data-sets by combining semi-structured interviews, focus group meetings and organisational reports and documents. Findings - The transition towards PCP can be best described as a learning process which cumulates the knowledge and experience in the client-supplier interaction accompanied by changing contractual and relational capabilities. In public infrastructure this process is not initially motivated by the benefits of value co-creation, but is politically driven. Practical implications - The study proposes three generic transition stages towards increased performance and infrastructural complexity moderated by contract duration. These stages may help managers of public agencies to identify the current procurement level and the contractual and relational challenges they need to master when facing higher levels of performance and infrastructural complexity. Originality/value - The study adds to the limited empirical and conceptual understanding on the nature of long-term public-private interactions in PCP. It contributes through a rare focus adopting a longitudinal perspective on these interactions in the transition towards PCP.
Keyword:
Value co-creation
Capability development
Buyer-supplier relationships
Procuring complex performance
Public infrastructure
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

I
International Journal of Operations and Production Management
IF:
7.4
论文数:
2.5K
被引数:
1.0W

机构

U
university of bath
学者数:
1.1W
论文数: 1.3W
被引数: 13
A
Aarhus University
学者数:
4.3W
论文数: 4.2W
被引数: 4.8W
U
university of twente
学者数:
1.5W
论文数: 1.4W
被引数: 9
U
university of london
学者数:
21.5W
论文数: 19.7W
被引数: 305
学者 查看更多机构
引用论文

引用论文

err分享
err收藏
Going privately: Partnership and outsourcing in UK public services
err2002-12-17
err157
PREAI
errGrimshaw, D; Vincent, S; Willmott, H
err分享
err收藏
The study of kinetics of CO2 absorption into 3-dimethylaminopropylamine and 3-diethylaminopropylamine aqueous solution
err2018-08-01
err0
errOAAI
errYanru Chen; Wusan Jiang; Xiao Luo; Yangqiang Huang; Bo Jin; Hongxia Gao; Wensheng Li; Zhiwu Liang
err分享
err收藏
WHAT PASSES AS A RIGOROUS CASE STUDY?
err2008-09-19
err1.6K
errOAAI
errGibbert, Michael; Ruigrok, Winfried; Wicki, Barbara
err分享
err收藏
Organizing for solutions: Systems seller vs. systems integrator
err2007-02-01
err354
errOAAI
errDavies, Andrew; Brady, Tim; Hobday, Michael
err分享
err收藏
学者 查看更多内容