arrow
返回

Reactive scheduling using parametric programming

delete2008-08-26
delete57
PRE
AI
Z
Zukui Li
M
Marianthi Ierapetritou *
DOI:10.1002/aic.11593delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
To address the various disruptive events that occur during process operations, reactive scheduling is commonly used. However, a major limitation of the existing reactive scheduling techniques is the response time, which might cause significant delay while the generation of a new schedule takes place. In this article, a novel approach is proposed to improve the efficiency of reactive scheduling and to avoid the resolution of a complex optimization problem when uncertain event occurs during the scheduling period. In the proposed method, reactive schedule is obtained from the solution of multiparametric programming problem, which is solved ahead of time and covers all possible outcomes of future uncertainty. The multiparametric programming problem is derived from a new reactive scheduling formulation, which integrates disruptive events (rush order and machine breakdown) as uncertain parameters in the process modeling. Several examples are presented to illustrate the effectiveness of the proposed approach. (C) 2008 American Institute of Chemical Engineers.
Keyword:
reactive scheduling
multiparametric programming
uncertainty
rush order
machine breakdown
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

Process scheduling under uncertainty using multiparametric programming
err2007-10-29
err45
PREAI
errLi, Zukui; Ierapetritou, Marianthi G.
err分享
err收藏
Heuristic procedures for reactive project scheduling
err2007-02-01
err70
errOAAI
errVan de Vonder, Stijn; Ballestin, Francisco; Demeulemeester, Erik; Herroelen, Willy
err分享
err收藏
err分享
err收藏
err分享
err收藏

期刊

AIChE Journal 封面图
AIChE Journal
IF:
4
论文数:
1.1W
被引数:
3.5W

机构

R
rutgers university system
学者数:
289
论文数: 833
被引数: 2.3W
引用论文

引用论文

Process scheduling under uncertainty using multiparametric programming
err2007-10-29
err45
PREAI
errLi, Zukui; Ierapetritou, Marianthi G.
err分享
err收藏
Arm MILP-based reordering algorithm for complex industrial scheduling and rescheduling
err2001-05-01
err71
PREAI
errRoslöf, J; Harjunkoski, I; Björkqvist, J; Karlsson, S; Westerlund, T
err分享
err收藏
Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
err2006-05-28
err111
PREAI
errJanak, Stacy L.; Floudas, Christodoulos A.; Kallrath, Josef; Vormbrock, Norbert
err分享
err收藏
Reaction Time-Controlled Synthesis of Multicolor Carbon Dots for White Light-Emitting Diodes
err2023-01-01
err0
PREAI
errJie Shen; Xujing Zheng; Liangliang Lin; Hujun Xu; Guihua Xu
err分享
err收藏
学者 查看更多内容