This research contributes to a realistic schedule development that will benefit construction industry professionals to better analyse float loss impact on project cost. The research paper draws attention to the importance of float and how affects project cost, beside that the paper tries to solve the dilemma of float ownership by determining the cost impact of float loss due to project parties' delays. The paper proposes a new approach that classifies the cost impact of float loss into four cases including: interruption of resource usage which will be analysed considering the forgetting and learning theories; effect of Cash flow change; impact of the price change for construction materials during float consumption; finally, float loss impact on crews' cost (Labour and equipment), while activities' duration increase. After that the paper provides a case study to discuss the developed framework and developed simple application tool to calculate the total cost. The results indicated that the float loss has a tangible effect on the total project cost. For the dilemma of float ownership, the float should be available for all project parties with responsibility for float consumption cost damages.
Keyword:
Float loss
resource usage
cash flow

期刊

International Entrepreneurship and Management Journal 封面图
International Entrepreneurship and Management Journal
IF:
3.9
论文数:
2.8K
被引数:
4.6K

机构

E
egyptian knowledge bank (ekb)
学者数:
11.6W
论文数: 9.3W
被引数: 84
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
Ecological Diversity and Abundance of Earthworms in Sylhet Metropolitan Area of Bangladesh
err2014-11-01
err0
errOAAI
errAthar Ali Makin; Md. Faruque Miah; Satish Kumar Yadav; Mitu Deb; Zobada Kanak Khan
err分享
err收藏
学者 查看更多内容