A method for project schedule delay analysis

delete2019-02-01
delete19
PRE
AI
G
Guida, Pier Luigi *
S
Sacco, Giovanni
DOI:10.1016/j.cie.2018.12.046delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
The analysis of schedule delays is a traditional problem in almost any project of some dimension and complexity. Assessing schedule delays and allocating them to responsible parties and activities is a sensitive problem in project management. In client-supplier, i.e. owner-contractor relations, the schedule delays represent a very important issue, often escalating into claims and undermining the commercial outcome of the whole project, involving lengthy negotiations and juridical cases, tracing to responsibilities and financial compensations. The present work tackles the problem of schedule delays, linking to literature already present on the subject and extending some solutions already published. In particular we introduce the concept of float bank, as a mean to assigning and sharing delay responsibilities between the project actors, i.e. owner, contractor and force majeure. We introduce the implementation of an algorithmic method and application of a complete case study which can be of interest to practitioners and stakeholders in the field of project management, potentially to integrate with commercial or in-house software and assist current project control, claim cases and newly so-called forensic project management.
Keyword:
Project management
Schedule delays
Critical path method
Delay analysis
Claim management
Float management
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
err2020-07-23
err26
errOAAI
errKoulinas, Georgios K.; Xanthopoulos, Alexandros S.; Tsilipiras, Thomas T.; Koulouriotis, Dimitrios E.
err分享
err收藏
Analysis of Causes of Delay and Time Performance in Construction Projects
err2014-01-01
err74
PREAI
errGonzalez, Pablo; Gonzalez, Vicente; Molenaar, Keith; Orozco, Francisco
err分享
err收藏

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
4.8W

机构

暂无机构信息
引用论文

引用论文

Rosmarinic acid treatment alleviates fibrotic changes in the myocardium induced in a rat model of insulin resistance
err2012-01-01
err0
errOAAI
errDhanapalan Karthik; Elumalai Arunkumar; Periasamy Viswanathan; Carani Venkatraman Anuradha
err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
没有更多内容