DEVELOPING COMPUTER-BASED SCHEDULE DELAY ANALYSIS METHODS BASED ON INFORMATION FLOW ANALYSIS: A CASE STUDY

delete2013-10-24
delete9
delete
OA
AI
M
Ming-Kuan Tsai *
J
Jyh‐Bin Yang
N
Nie-Jia Yau
DOI:10.3846/13923730.2013.801901delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Schedule analysts often resolve diverse schedule delay problems in construction projects based on their subjective experiences. Although various process-based and mathematical-model schedule delay analysis methods are available for effective schedule delay analysis, these methods require time-consuming manual operation. The use of computer-based schedule delay analysis methods seems to be a solution. However, schedule analysts still have difficulty developing computer-based schedule delay analysis methods. Therefore, this study applies information flow analysis to classify the necessary work to develop computer-based schedule delay analysis methods. In contrast to numerous studies that focus only on computerizing a process-based or a mathematical-model schedule delay analysis method, this study constructs a computer-based method that integrates two process-based schedule delay analysis methods simultaneously. In a tested case study, the delay liability for the project owner and contractor was classified successfully. Importantly, this study provides a useful reference for similar applications in project management.
Keyword:
analytical techniques
claims management
construction dispute
schedule delay
programming technique
project management software
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

A method for project schedule delay analysis
err2019-02-01
err19
PREAI
errGuida, Pier Luigi; Sacco, Giovanni
err分享
err收藏
Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
err2020-07-23
err26
errOAAI
errKoulinas, Georgios K.; Xanthopoulos, Alexandros S.; Tsilipiras, Thomas T.; Koulouriotis, Dimitrios E.
err分享
err收藏
Application Issues of Impacted As-Planned Schedule for Delay Analysis
err2022-09-13
err1
errOAAI
errKim, Kyong Ju; Han, Bonghee; Park, Min Seo; Kim, Kyoungmin; Kim, Eu Wang
err分享
err收藏
err分享
err收藏

期刊

J
Journal of Management in Engineering
IF:
7
论文数:
3.1K
被引数:
7.9K

机构

N
National Central University
学者数:
650
论文数: 250
被引数: 3.2K
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Prevalence of Oryzopsis Hymenoides near Harvester Ant Mounds: Indirect Facilitation by Ants
err1990-06-01
err0
PREAI
errR. S. Nowak; C. L. Nowak; T. DeRocher; N. Cole; M. A. Jones
err分享
err收藏
Mechanism of phenanthrene degradation by the halophilic Pelagerythrobacter sp. N7
err2024-02-01
err0
PREAI
errXiangjin Li; Xinghong Cao; Zuotao Zhang; Yichun Li; Yue Zhang; Chongyang Wang; Weihua Fan
err分享
err收藏
学者 查看更多内容